⚡
Home / Comparing quotes like for like

Comparing quotes like for like — Mkhuhlu

Three quotes can differ 40% for identical scope. Compare:

Then compare price. A cheap quote missing half this list is not cheaper.

Mkhuhlu: Maintained by the solar inverter generator mkhuhlu desk.

Frequently asked questions

Do I need municipal approval for solar in South Africa?

Grid-tied systems generally require SSEG registration with your municipality and a CoC signed by a qualified electrician. Off-grid/backup-only inverter systems still need a legal CoC but usually no feed-in registration. Requirements vary by municipality - your installer should handle the paperwork.

What size inverter do I need for load-shedding?

For essentials (lights, Wi-Fi, TV, fridge, security): 3-5kVA inverter with a 5kWh battery. To run geyser or stove too, budget 8kVA+ and 10kWh+ of storage.

How long does installation take?

A typical backup inverter + battery install takes 4-8 hours. A full hybrid solar system with roof panels typically takes 1-3 days including CoC sign-off.